SE212

SE212

Objective:      To give the student the basics of ground survey measurement techniques
Field and lab tasks:
§  Training on distance measurement using Tapes, Optical Instrument (ODM) and Electromagnetic Instrument (EDM) techniques.
§  Training on leveling operations.
§  Training on horizontal and vertical angles measurements using theodolites.
§  Measurement of planimetric areas using planimeter.
 
Field & Office Work Tasks:
1.     Planning
2.     Reconnaissance
3.     Sketching
4.     Station Marking
·        Either with a temporary mark such as a wooden peg
·        Or by a permanent mark normally in the form of a concrete pillar set into the ground or a bolt let into a rock surface
5.     Field observations and booking
6.     Reduction and adjustment of observations
7.     Computation of results
8.     Compilation of results
9.     Plotting
10.                        The survey report
 
Survey Report
A lab report must be submitted one week after the field work. The report should contain the following 5 sections:
       i.            Objectives (purpose of the field work)
     ii.            Field procedure (equipment used & the procedure)
  iii.            Field notes (include the original field notes)
  iv.            Calculations and results
     v.            Comments and conclusions
المرفق الحجم
Course Content.doc 35.5 كيلوبايت
Chain Surveying.doc 53.5 كيلوبايت
التطبيقات بالشريط.doc 68 كيلوبايت
ملحقات المادة الدراسية